Friday, September 28, 2012

Lights!

The lights are finally up and working. I'm really happy with them too. Picked up the wire and everything we need to hook it up so we can work after dark now. Very handy since the days are getting so much shorter.

Also have a pic of my 100% finished floor. No more flooring to do yay!

We have 1 window let to trim and all the floor/ceiling moulding to do. Shouldn't take more than a day.



Sunday, September 23, 2012

Weekend Progress

Another busy weekend and some good progress made!


 
The center beam in the main room is up and the lighting is (mostly) figured out. It was super complicated because of the 3 way switch. You can also see the wall and flooring in the small loft is done.




Here's a close up. You can see the strip of blue foam, that will have a trim piece over it. You can't have it tight to the wall because it's a floating floor and if you have it snug it will expand and buckle.



My sleeping loft now has ALL it's walls done. In this pic only the back one is up, but we did the others Saturday. Still have to trim the windows and do the ceiling. NOT looking forward to the ceiling. Weird angles and all.

Also not pictured is the entire floor downstairs is done, and the windows in the main room are trimmed.

We were working on figuring out the wiring for the lights tonight and had a construction light hooked to an extension cord in there because it was getting dark. I have to say the pine lit up at night is so pretty and homey looking...I love my house!

Wednesday, September 19, 2012

Floors and Whatnot

Never did find the bathroom faucet so ended up buying a new one. :/ It was a pain to install but I got it in ok and it looks nice!


The front loft wall is done and the window is trimmed, all that's left to do up there is the flooring. No pic, it was too back lit for my phone and I didn't have my camera with me. Looks great though.

Trimmed some windows. It went easy but had to quit after just two because it was getting late. It's a bit frustrating to only have a few hours at the end of the day to work on the house.

And the flooring is going in. I would have preferred white maple, but this light oak was less than half the price so that won me over real quick!

It's starting to look like a house inside and not just a construction project. :)





Wednesday, September 12, 2012

I DO Give a Crap about my House

And now I have a toilet to make that more convenient!

And a sink too! Although the sink fixtures are MIA. Also have the lights in the bath and utility room done, and the whole house is now deviced. Apparently that is the tech term for wiring in the outlets and switches.

Oh yes and the bath floor is in AND the tankless heater! Whew! Lots happened this week...

Monday, September 3, 2012

Tongue & Groove

Well! Been a bit busy lately. Tongue & groove ceiling is in in the main room and front loft!

The guys took the door off so they didn't ding it up while coming and going, but I wanted it back on before dark because I didn't want kitty Oscar to go in and spray.

Also picked up the bathroom flooring yesterday. Hopefully will go in soon.
The tankless heater is mounted, just need to finish hooking it up.

It's going quick but there's still a lot to do!

Sunday, August 26, 2012

Bathroom and Closet

Sounds like an obscure style journal, but it's really just what we've constructed since last post.

I now have BOTH my closets built and sheetrocked. 


My itty bitty utility room (right) and my bathroom walls are built and sheetrocked except...


Half of the interior of my bathroom is tongue and groove pine, like my ceilings.

And my shower is in! It's so flippin perfect. It's 32'' x 32'' Maax the Mediterranean model. Fits perfectly and is roomy enough to be comfortable for daily use.

Can't believe how fast it's going, and how fast my money is going too! So I applied for and GOT a job cleaning on Wednesdays. This is kinda my first real job working for someone. We'll see how it goes, right now I just really need the $ tho. So I'm willing to work for it.

Monday, August 20, 2012

Style Shift

All along I have been picturing my tiny house with knotty pine plank siding on the interior. Like a spa or a cabin or an apartment (flat?) in Europe. Or how I would picture an apartment in Europe anyway.

When it came down to it it turns out that kind of siding is a bit cost prohibitive. So dad suggested drywall. After about 10 minutes of reworking my mental image of my house I started to get really excited about it.

The ceilings, trim, lofts, and flooring will still be that light pine. But my walls can be, well, any color I like! I already have the main room color picked out and a good idea of what I want for the other 2 rooms, but I'll let that be a surprise for you.

We are making steady progress on the house now that things have cooled down temp wise. We've sheetrocked the interior, finished the ceiling in the bathroom and utility room, built the utility room wall, and just today built the first closet.

And quite exciting for me was painting the inside of my door TARDIS blue!