Dad found this bench at one of his job sites and got permission to take it home. It's pretty much exactly what we were going to build but it's already made. So super cool. Just REALLY needs reupholstering. But that's easy.
Sunday, October 28, 2012
Sunday, October 21, 2012
Septic Stuff
After finishing the loft ceiling we've moved outside to do the septic system, water, and power line. All I know about it is it was expensive and I never want to touch a shovel again...
Labels:
construction,
lusby,
tiny house,
tumbleweed house
Monday, October 15, 2012
More Color and a Door!
We have been cruising along on the house lately. Today I painted my bathroom and utility room and when dad got home from work we did three of the four remaining angles on the loft ceiling.
SO close to being done with the loft, but we ran out of lumber. We're estimating 10 more boards will be enough to finish off the loft and make the two closet doors. Speaking of doors...
Inside the bathroom with my new 'slight yellow' paint. Had to stand in the shower to get a shot of the door, wall and window. Think I need as fish eye lens on my iphone...
SO close to being done with the loft, but we ran out of lumber. We're estimating 10 more boards will be enough to finish off the loft and make the two closet doors. Speaking of doors...
The bathroom door is up! And you can see how good the loft looks in this, AND notice the framing around the utility room door? Decided that made it look more finished. The utility room is painted 'submarine' grey, crappy name, cool color. Also put up the facing board on my sleeping loft. It's really starting to look like a house now. My house. :)
Inside the bathroom with my new 'slight yellow' paint. Had to stand in the shower to get a shot of the door, wall and window. Think I need as fish eye lens on my iphone...
Labels:
construction,
lusby,
tiny house,
tumbleweed house
Sunday, October 14, 2012
And we have Color!
Lots of pictures on this one!
Hey lookie here:
Yes, that's right, the loft ceiling is HALF done, in one day no less!! We finally figured out how to do it so it it's going quick now.
YESS!!!
Labels:
construction,
lusby,
tiny house,
tumbleweed house
Saturday, October 13, 2012
Kitchen Counter
Can't think of a creative title, had too much to drink last night. :(
House is really getting done! 99% of trim work is done. Bathroom door is constructed. And very excitingly the kitchen cabinets are under construction. Just started last night and they look awesome already.
House is really getting done! 99% of trim work is done. Bathroom door is constructed. And very excitingly the kitchen cabinets are under construction. Just started last night and they look awesome already.
Here you can see my handy dandy bathroom heater. It's so effective I don't really need another heater.
Not bad for a day's work!
Labels:
construction,
lusby,
tiny house,
tumbleweed house
Subscribe to:
Posts (Atom)